Private Forums
Coiled Tubing Reverse Clean outs
02 November 2007
I am looking to find out peoples experiences with reverse cleaning
out of completions using coiled tubing. I am currently working on a
subsea development where 5 wells are shut-in due to sandface
failures which we would like to side track. The completion tubing is
5-1/2” and the plan is to use 1-3/4” coil. One of the biggest
drivers was due to the riser length (4,000ft).
Any feedback would be much appreciated.
0 answer(s)
Posted by

Garry Sinclair

Senior Completions Engineer

CNR International

Total Posts: 1
Jump to top of the page