Conductor load test with BOP stack

Hi all,

Is there anyone heard about slacking BOP stack weight on the wellhead after latching?

There was a question raised in our risk assessment. How do we ensure that 30" conductor with 20" casing cemented will be able to hold the weight of a big BOP stack (6 rams cavity) after emergency disconnect? There was an idea came up to slack BOP weight on the wellhead after latching to see the subsidence that may occur. Anybody have heard about it???

Thank you,
Praisont Prasertamporn