Private Forums
Chrome Tubing Handling & Running Procedures for use in the field
25 April 2017
Hi folks

At an upcoming CWOP, we plan to discuss the handling and running of chrome tubulars.  The tubing in question is 4½" 25%Cr-125 15.1 ppf with JFE Bear connections.  Thread compound will be API modified Best-o-Life.

The various tubing suppliers have guidance for handling tubulars, but we're hoping to be able to discuss/develop a 'practical' field guide to cover: laying out, picking up to the drill-floor (this is a land-rig), M/U and running.

If any of our members has an example 'field guide' and/or checklist that they can share with us, we would be able to get off to a flying start.  In return, we would post the final version on this site in about 3 weeks time.

Many thanks

Dave
4 answer(s)
JDDrouin
QA/QC Subsea Wellhead Specialist
SPREADAssociates
Total Posts: 89
Join Date: 06/05/09
Dave,

Attached is Sumitomo's.

Dominic
Augusto
Consultant [retired Shell staff]
SPREADAssociates
Total Posts: 244
Join Date: 02/09/05
CORRECTION

SPE DE Dec. ’88 + Hydril Magazines. 


Augusto
Consultant [retired Shell staff]
SPREADAssociates
Total Posts: 244
Join Date: 02/09/05
Vide

1990 SPE DE The importance of correct running and Handling procedures for Premium Tubular Goods of 13% Cr.OCTG AtlasBradford. API 5C1

JDDrouin
QA/QC Subsea Wellhead Specialist
SPREADAssociates
Total Posts: 89
Join Date: 06/05/09
Dave,

Attached.  There are probably other tubular suppliers with the same.

Dominic
Documents uploaded by user:
Tenaris Hydril Chrome Running Guidelines.pdf
Posted by

Dave Taylor - SPREAD Moderator

Managing Director (rp-squared.com)

Relentless Pursuit Of Perfection Ltd.

Total Posts: 403
Jump to top of the page