Private Forums
Fatigue predictability - Top Drive/Drawwork/Hoses
24 April 2018
Talking about onshore drilling in US, we know that a well can be up to 25K feet deep. Considering all section, casing running and the drilling activity itself, how many times the top drive goes up and down (cycling) in a single well? How are we predicting the failure of equipment and small components in order to minimize the NPT? 
0 answer(s)
Jump to top of the page