10 3/4" Casing Coupling Clearance

We are planning to run a tapered string of 10 3/4" 45.5ppf Vam Top x 9 5/8" 47ppf VamTop casing inside 13 3/8" 68ppf casing. I just wanted to check since its a while since I ran 10 3/4" casing that the clearance between the coupling OD (11.4") and 13 3/8" casing ID (drift ID of 12.259") shouldn't pose problems with subsequent cementing operations. Any feedback on this matter would be gratefully received.

Ian McIlwaine
Drilling Operations Manager
SASOL, Jo'burg
0 Answer(s)

Support Spread

We need the support of our members to keep our forum online. If you find the information on spread useful please consider a donation

donate