DISCUSSIONS

Unanswered
SUBJECT POSTED BY GROUP LAST ACTIVE REPLIES
Maximum RPM/WOB for UR -XR-800-8.5''x10-1/4'' Usama Sabir Drilling Operations 13 August 2023 13
Kick tolerance evidence. Peter Aird Well Integrity 15 August 2023 7
National (Universal) Colour Code for Lifting Equipment Dave Taylor - SPREAD Moderator Logistics 06 August 2023 3
(Temporary and/or Low Cost) Heat Shields for Jack-up working alongside Wellhead Platform Dave Taylor - SPREAD Moderator Rig Specific & Surveys 02 August 2023 7
Milling 4 1/2in production upwards with Coil Tubing Soren Hartmann P&A (Decommissioning) 18 June 2023 0
Dropping bandit in ESP Wells Mohammad Mosaddegh Completion 17 November 2023 5
MPD / Drill-string Wash-out pressure loss Gerald Watermeyer Drilling Equipment 11 June 2023 2
Suspected Drillstring Washout Oloyede Oyediran Drilling Operations 11 June 2023 0
Holding time for sealability evaluation (ISO 13679 / TWCCEP) Oscar Grijalva Casing & Liners 16 June 2023 3
Review of Vertex Downhole Tools Pulkit Goel Performance 21 May 2023 2
Peloton Integration to MS Power BI Yerlan Amanbayev Drilling Software 07 May 2023 0
Wellbore cleanup tools for 13% Chrome casing Tarek Boughanmi Completion 17 November 2023 5
Directional Drilling BHA Harald Benning Drill String Design 11 May 2023 12
Workover on1980 well not able to flow oil to surface due to damage during completion Alex Williams Workover 07 May 2023 4
Near bit ejector unit 'NBEU' tool? Peter Aird Drilling Operations 07 May 2023 5
Install centralizers in 18-5/8” casing on pipe rack Mohamed Aboubakr Casing & Liners 03 May 2023 5
Annular preventer Marten Westink Well Control 04 May 2023 5
Coiled Tubing Cementing Edwin Damasena Cementing 24 April 2023 8
Old drilling mud and tubing impede progress Alex Williams Drilling Operations 04 May 2023 9
Offshore riserless drilling, massive sandstone intervals Peter Aird Hole Problems 01 June 2023 7