DISCUSSIONS

Unanswered
SUBJECT POSTED BY GROUP LAST ACTIVE REPLIES
Fly or Jet pump design, for use in well cellars Jorrit Schreuder Drilling Operations 18 March 2024 6
Plugged Chemical Injection Line Peter Forsyth Completion 05 March 2024 6
Determining Iron content from a Completion Fluid sample Estevão Rodrigues Completion 18 February 2024 1
Top 10 (non-injury) wellbore drilling / workover accidents** Peter Aird Training and Competency 18 February 2024 1
Failure of wireline logging (CBL/VDL) for 13"3/8 surface casing at a depth of 272 meters ZERTI ABDERRAHMEN General discussions 12 March 2024 9
Kick off pressure for 2 packer case Abdelmoumen Bacetti Well Control 08 February 2024 3
Risk assessment samples for (5.1.3.3 and 5.1.4) sections from API STD 53. Maher Sahmi Well Control 09 February 2024 1
Soft skills training ( well construction / drilling professionals) Peter Aird Training and Competency 17 December 2023 2
Setting an ECP / ACP (inflatable type) across a slotted liner or similar such solutions Syed Asad Abid Completion 14 December 2023 10
Comparison between drive 30" conductor vs. drill & cement 30" conductor Elsayed Nasr Drilling Operations 03 December 2023 0
conductor driving Phil Hardy Drilling Operations 03 December 2023 8
Definition of On-bottom/Off-bottom hours Usama Sabir Performance 30 October 2023 7
VAGT and New Vam Mohamed Mekhimar Drilling Operations 29 November 2023 5
MLS tieback for P&A operations Kornelius Boersma Mudline Suspension Systems 01 October 2023 0
Help us find: 20" Xover joint for Subsea Well Dave Taylor - SPREAD Moderator Casing & Liners 22 September 2023 4
Aggressivity of Under-reamer Vs PDC bit. Usama Sabir Drilling Operations 10 September 2023 4
Downhole torque Reza Borah Drilling Operations 27 August 2023 1
NSD on Floating Rig Huib Attema Drilling Operations 25 August 2023 8
Maximum RPM/WOB for UR -XR-800-8.5''x10-1/4'' Usama Sabir Drilling Operations 13 August 2023 13
Kick tolerance evidence. Peter Aird Well Integrity 15 August 2023 7