DISCUSSIONS

Unanswered
SUBJECT POSTED BY GROUP LAST ACTIVE REPLIES
Install centralizers in 18-5/8” casing on pipe rack Mohamed Aboubakr Casing & Liners 03 May 2023 5
Annular preventer Marten Westink Well Control 04 May 2023 5
Coiled Tubing Cementing Edwin Damasena Cementing 24 April 2023 8
Old drilling mud and tubing impede progress Alex Williams Drilling Operations 04 May 2023 9
Offshore riserless drilling, massive sandstone intervals Peter Aird Hole Problems 01 June 2023 7
BOP Removal Un Perforated Well Derek Munro Well Control 11 April 2023 10
Balanced Cement Plug with string 5.5" DP inside 9 5/8" CSG 47 ppf Mohamed Abdellatif Cementing 21 April 2023 12
Wellhead Connector Glycol Injection Huib Attema Drilling Equipment 26 March 2023 3
Sacrificial Fiberglass Tubing Colin Hossack Cementing 22 March 2023 16
Highest mud weight Liqun Han Drilling Fluids 08 August 2023 7
Reamer vs Stabilizer vs Reaming Stabilizer Umair Ahmed Baig Drill String Design 19 March 2023 6
Advanced casing design (training) Peter Aird Casing & Liners 13 March 2023 3
9 5/8" Casing Flapper Valve Rene Rivard Drilling & Completion 05 March 2023 4
Cemented Drill-In Structural Pilings for Floating Windfarm Anchors Steven Rosenberg Cementing 21 February 2023 9
3 1/2" Inner String Run Inside 4 1/2" Tubing Andrew Hepburn Drilling & Completion 21 February 2023 5
Tieback for 30” conductors that have been cut at the seabed Reetum Chakraborty Completion 14 March 2023 5
API 16AR - Pressure Contact (Metal-to-Metal) Sealing Surfaces Pieter van Biljon General discussions 12 February 2023 0
SPE certification Srinivas Bandaru Well Services 09 February 2023 11
0psi SPP/3bpm - through tubing motor clean out BHA. Maher Sahmi Workover 15 January 2023 9
Bragging Rights: Look Back and Forward Dave Taylor - SPREAD Moderator BLOG : Relentless Pursuit of Perfection 08 January 2023 0