ALL DISCUSSIONS IN DRILLING OPERATIONS

Unanswered
SUBJECT POSTED BY GROUP LAST ACTIVE REPLIES
36″ Hole (Stab & X/Over) Iain MacLeod Drilling Operations 11 May 2021 2
Drill Bits Selection Benjamin Arawore Drilling Operations 11 May 2021 0
Drilling and cementing practices for paleosol formations Bruce Richardson Drilling Operations 11 May 2021 1
Wireline Nuclear Sources Elisa Urbinati Drilling Operations 11 May 2021 1
Drilling out 20″ casing shoe with 12¼″ bit Elisa Urbinati Drilling Operations 11 May 2021 8
26″ Unusual Bit Failures Mike Robinson Drilling Operations 11 May 2021 5
Drilling Shoetrack with Bi-center bit Dave Taylor - SPREAD Moderator Drilling Operations 11 May 2021 2
Drilling shoetrack with 1.15 deg bend in motor (and PDC bit) Dave Taylor - SPREAD Moderator Drilling Operations 11 May 2021 24
XLOT Procedure Scott McNeil Drilling Operations 11 May 2021 7
RMR or CTS deployment Ron Mackay Drilling Operations 11 May 2021 0
Drilling ~2000m of 26" hole - best practices Aydin Aghazada Drilling Operations 11 May 2021 22
Drill 13 3/8" shoetrack with 8 1/2" drilling BHA Ronny Siregar Drilling Operations 11 May 2021 12
Guides for a Well Control procedure for shale gas / coal bed methane drilling. Cst Flr Drilling Operations 11 May 2021 3
Gas Detectors James Drouin Drilling Operations 11 May 2021 3
Welding 30" conductor casing Chajar Sugiarto Drilling Operations 11 May 2021 10
Severe Vibration Drilling Top Hole Lyle Hopkins Drilling Operations 11 May 2021 22
Fishing drill pipe sheared in error. Chris Henderson Drilling Operations 11 May 2021 4
Drilling top-hole with SOPBM and divertor only Edwin Damasena Drilling Operations 11 May 2021 4
Drill pipe screens for XT-54 pipe Tim Harrison Drilling Operations 11 May 2021 4
Drifting drill-pipe Dave Taylor - SPREAD Moderator Drilling Operations 21 December 2022 10