Pipesticking issues to be sorted out
The following forum is informational and brief regarding the plumbing,drilling.During drilling operations or procedure, a following pipe is considered stuck if it cannot be freed and pulled out of the hole without damaging the pipe and without exceeding the drilling rig ’ s maximum allowed hook load. Differential pressure pipe sticking and mechanical pipe sticking are addressed in this section.Suggest us what to follow out regarding the maintenance company in dubai for the ultimate resolution.0 Answer(s)
PLEASE LOGIN OR SIGN UP TO JOIN THE DISCUSSION
Support Spread
We need the support of our members to keep our forum online. If you find the information on spread useful please consider a donation
Posted by
Related Discussions
Milling through a casing collar
With this down turn in our industry are multilaterals a useful well construction technique to reduce costs?
Expert Training Support Offer : How the Latest ERD Innovations Can Benefit Your Deviated Wells
How to remember everything you have ever learned.
Coiled tubing bridge plug milling