Minimum variabile deck load

For Subsea development operations (drilling/horizontal xmas tree running, completion and well test) with a DP Rig in 600 m water depth in Med sea with batch drilling and bop hopping between wells, what would be the minimum variable deck load required? And what type of unit would you prefere?
0 Answer(s)

Support Spread

We need the support of our members to keep our forum online. If you find the information on spread useful please consider a donation

donate