Minimum variabile deck load
For Subsea development operations (drilling/horizontal xmas tree running, completion and well test) with a DP Rig in 600 m water depth in Med sea with batch drilling and bop hopping between wells, what would be the minimum variable deck load required? And what type of unit would you prefere?
0 Answer(s)
PLEASE LOGIN OR SIGN UP TO JOIN THE DISCUSSION
Support Spread
We need the support of our members to keep our forum online. If you find the information on spread useful please consider a donation
Posted by
Related Discussions
Rig Generations
Rig Inspection For High Pressure Well
ensuring vertical hole
Moving Semi Sub at Deep Draft
Fishing Nets