Subject ▼ Posted By ▼ Group ▼ Last Active ▼ Replies ▲
Drilling 8½ hole with 5... Dave Taylor - SPREAD Moderator Drilling Operations 20 November 2013 24
Drilling shoetrack with 1.15 d... Dave Taylor - SPREAD Moderator Drilling Operations 14 December 2013 24
BOP Testing - interpreting the... Tom Macrae Deepwater specific 28 March 2017 23
Coring with pipe similar to 34... Ahmed salem Conventional Coring 18 July 2016 23
Drilling ~2000m of 26" hole -... Aydin Aghazada Drilling Operations 04 March 2015 22
Severe Vibration Drilling Top... Lyle Hopkins Drilling Operations 29 March 2012 22
Sidetracking in deep, hard, ho... Chris Henderson Well Control 12 December 2009 21
36″ Underreamer Kevin Stilwell Drill String Design 03 July 2013 20
Use of drilling jars when runn... Dave Taylor - SPREAD Moderator Data Acquisition 09 September 2013 19
Hole Opening in Hard Formation... David Brecknock Hole-openers and under-reamers 02 September 2014 19
BOP test frequency : changes p... Dave Taylor - SPREAD Moderator Well Control 15 August 2015 19
Semi Sub in Very Shallow Water Paul Anderson Rig Specific & Surveys 26 August 2011 19
BOP Test Sub ("Double Dutch Su... Dave Taylor - SPREAD Moderator Drilling Equipment 07 May 2015 18
Casing rams Mike Fraser Well Control 09 September 2015 18
Ported vs. non-ported floats .... Dave Taylor - SPREAD Moderator Drill String Design 26 November 2014 18
Cut & Pull 9-5/8" Casing Graham Falconer Drilling Operations 10 May 2015 17
Factors in Determining Shoe Tr... Jov Rodrigues Cementing 15 February 2016 16
Bit Torque estimation Venkat Chitor Drilling Operations 19 January 2016 16
Downhole Deployment Valve (DDV... Chris Anderson Drilling Equipment 25 May 2015 16
Should we consider Sub Surface... Heiko Fuchs Well Control 18 April 2016 16