Mud mats in deepwater. Peter Aird Deepwater specific 11 May 2021 10
Changing DP size from 5″ to 5½ Dany Rizka Drill String Design 11 May 2021 10
Problems jetting out jackup legs in GoM Dave Taylor - SPREAD Moderator Rig Specific & Surveys 11 May 2021 10
Hole Opening with motors Chris Henderson Drill String Design 11 May 2021 10
Basics of Fraccing Scott McNeil Drilling & Completion 11 May 2021 10
Erratic toolface due to heave compensation in top hole Mase Yan Deepwater specific 11 May 2021 10
Land rig-move at night Dave Taylor - SPREAD Moderator Rig Move 11 May 2021 10
Removing a cemented sacrificial stinger Craig Duncan Abandonments (facilities and/or wells) 11 May 2021 10
Recovery of ABB Vetco Gray SG5 wellhead from template Douglas Noble Abandonments (facilities and/or wells) 03 November 2023 10
Reaming Practices & Bit Balling Umair Ahmed Baig General discussions 11 May 2021 10
Drilling ahead through an uncemented shoe Ken Horne. Drilling & Completion 11 May 2021 10
Brown field low cost well design options Chris Sugden Performance 11 May 2021 10
13-3/8" Double valve Autofill type TOPCO float shoe Float Collar Bhushan Salve Drilling Equipment 11 May 2021 10
Suction Dampener of mud pumps Montader Alsuhail General discussions 11 May 2021 10
Drilling into a Potential Losses Zone with 20ppg MW: WBM or OBM? * Micromax experience* Jeff Russell HTHP 11 May 2021 10
Hydril annular element Mike Fraser Well Control 11 May 2021 10
Welding 30" conductor casing Chajar Sugiarto Drilling Operations 11 May 2021 10
Threaded connections Chris Henderson Drill String Design 11 May 2021 10
Kill a gas well after testing Cristian Mihalcea Well Control 11 May 2021 10
Bore hole stress Chris Henderson Data Acquisition 11 May 2021 10