DISCUSSIONS

Unanswered
SUBJECT POSTED BY GROUP LAST ACTIVE REPLIES
Milling operations Optimisation & cementing across milled interval Adrian Chong Abandonments (facilities and/or wells) 11 May 2021 1
Alternate Barrier elements certification acceptance by Industry Adrian Chong New Technologies 01 March 2022 0
Horizontal HPHT wells AGR Drilling & Completion 11 May 2021 3
Schluberger MPM Ahmed salem Completion 11 May 2021 0
Slot Recovery Ahmed salem Abandonments (facilities and/or wells) 11 May 2021 7
Blasting in proximity of existing wells. Ahmed Ibrahim Due Diligence 11 May 2021 1
Verification and testing of sacrificial stinger cement plugs Ahmed Hamendi Abandonments (facilities and/or wells) 11 May 2021 0
Gas well head moving Ahmed salem HTHP 11 May 2021 6
Coiled tubing stuck ahmed bereak Completion 11 May 2021 2
Effect of oil base mud on PDC bits wear and Dull compared to water base mud Ahmed Abdelhamid Drilling Fluids 11 May 2021 9
7″ Liner Cement Planning Ahmed Abdelhamid Cementing 11 May 2021 8
Coring with pipe similar to 34"OD Ahmed salem Conventional Coring 11 May 2021 20
Pipe / Casing Tally by Using Ultrasound Ahmed salem Casing & Liners 11 May 2021 3
Drilling Sub Load Rating Calculation Ahmed Mushtaq Drill String Design 11 May 2021 4
Predict ROP while drilling with PDC bit Ahmed Mazen Bits and other Hole Making Tools 11 May 2021 5
Making up crossover to GE WBRRT Akio Suzuki General discussions 11 May 2021 1
Undereaming/Bi Center Bits Al Milne Drilling Equipment 11 May 2021 2
Recovering 7" EZSV Remains Above 5" Liner Al Milne Completion 11 May 2021 4
Cementing with air/foam in hole. Al Milne Cementing 11 May 2021 1
Dope-less Connections Al Norcroft New Technologies 11 May 2021 2