ALL DISCUSSIONS IN COMPLETION

1.Artificial Lift 2.Completion Equipments 3.Completion Fluids 4.Horizontal / ERD wells 5.Multi-Laterals 6.Multi-phase Flow 7.Perforating 8.Safety Issues 9.Sand control 10.Tubing Stress

Unanswered
SUBJECT POSTED BY GROUP LAST ACTIVE REPLIES
Hydraulic fracturing Allan Lennox Completion 11 May 2021 9
Locating seal assembly inot a sealbore receptacle. Nelson Abadebenghan Completion 11 May 2021 0
Liquid Silicon in the Dome of Gaslift Valve Huy Vu Huu Completion 11 May 2021 1
Chemical injection line drainage Mike Swankie Completion 11 May 2021 3
Close tolerance between casing/tubing dave buckley Completion 11 May 2021 6
Temperature Effects On CaBr Brines Jim Daniels Completion 11 May 2021 7
Pipe dope dissolvers Mike Swankie Completion 11 May 2021 2
Swell packer placment Mike Swankie Completion 11 May 2021 7
Liner Buckling/Distortion in an Open Hole Multi-Stage Horizontal Well Completion David Jackman Completion 11 May 2021 7
Tubing annulus comunication in water injector wells Farouk Alhassan Completion 11 May 2021 1
Completion Fluid for HT Condition Sri Khresno Completion 11 May 2021 3
Tubing leak detection Farouk Alhassan Completion 11 May 2021 3
Slotted liner or Screen completion option Andi Rizen Completion 11 May 2021 2
Well control contingencies when running drilled or slotted liners Mike Schneider Completion 11 May 2021 4
Completion for gas-conedsate reservoir with initial pressure below hydrostatic Valentin Pehoev Completion 11 May 2021 1
Stinging Upper Completion Seals into Lower Completion Packer Bore Tayo Ajimoko Completion 11 May 2021 4
Slotted Liner design Mohamed Gabry Completion 11 May 2021 2
Coiled tubing stuck ahmed bereak Completion 11 May 2021 2
High expansion RBP Mike Swankie Completion 11 May 2021 6
Rigless Xmas Tree Installation Stephen Whitehead Completion 11 May 2021 6