Semi-Sub Operational Effectiveness
03 March 2010 As part of my MSc final year Project, I am studying the operational effectiveness of different types of drilling rigs and the advantages and disadvantages of their design, lay out and equipment etc.I am specifically interested in the semi-subs currently working in the UKCS and wondered if anyone knew of any papers or reviews that have been written which evaluate and compare for example Enhanced Pacesetters, Aker H-3, Bingos, 700/711 series, and the larger units such as Offshore Co. SCPIII (NTvL), Zapta (J.W. McLean) and Paul B Loyd Jr (Aker H-4). From an operational side I am interested in items such as station-keeping, waiting on weather, BHA handling time, tripping speeds, BOP running times and so on. From a rig design point of view I am interested in the issues associated with, for example, raised catwalks, single V doors, usable deck space etc.
Thanks
Karyn Hossack
Drilling Engineer
Maersk Oil & Gas UK
3 Answer(s)
PLEASE LOGIN OR SIGN UP TO JOIN THE DISCUSSION
Support Spread
We need the support of our members to keep our forum online. If you find the information on spread useful please consider a donation