XT 57, Tight Drillpipe Connections
02 December 2007 We have a sting of 5 7/8" Grant Prideco Drillpipe with a XT57 thread.We are having major problems with the tool joints not breaking.We now
have had to purchase a set of HT200 rig tongs. As it can take up to
110k to break the joints.
The drillpipe has the treads cleaned, and pin and box re-dopped on
each trip. A drilling break of the string is done off bottom on every
trip. The max TQ seen on the string is 30kft/lbs, downhole temp is
105 deg C. The drillpipe is made up to 50kft/lbs and Koper-Kote dope
is used.
Is there anyone out there who have this string and DO not have this
problem?
1 Answer(s)
PLEASE LOGIN OR SIGN UP TO JOIN THE DISCUSSION
Support Spread
We need the support of our members to keep our forum online. If you find the information on spread useful please consider a donation
Posted by
Related Discussions
Avoiding Stick Slip
Jars
Jars Jars Jars
BHA Inspection Criteria
H2S effect on PDM elastomers