BOP testing subsea
01 October 2013 Subsea BOP testingCan BOP pressure testing (subsea) be completed if any of one (valave) out of four (2 choke & 2 kill) fails?
BOP stack consists of two annular BOP & two Double ram bop (shear ram, pipe ram, vbr & test)
BOP stack diagram attached.
Thank YOU.
Documents uploaded by user:
0 Answer(s)
PLEASE LOGIN OR SIGN UP TO JOIN THE DISCUSSION
Support Spread
We need the support of our members to keep our forum online. If you find the information on spread useful please consider a donation