Running an ESP completion with Y-tool through a whipstock?
02 December 2013 Hi all,We are planning to run an ESP completion with a Y-tool on one of our offshore wells. The well will be sidetracked and reservoir will be drilled with 8½
The Service company which supplies the ESP and y-tool is afraid that the complete assembly will not pass through the installed whipstock. The given DLS over the whipstock is 10 degrees.
Other information:
- Y-tool OD: 8.05"
- ESP OD: 5.62"
- By-pass tubing size: 2⅞"
- Length complete assembly: 35m Max.
- 9â…" 47# Casing installed across the whipstock (ID: 8.681", Drift: 8.525")
- The BHA which will drill the reservoir (8½) has 8¼" Stabilizers at 8, 21 and 30m above the bit.
Does anybody have any experience with this?
Kind regards,
Bart
7 Answer(s)
PLEASE LOGIN OR SIGN UP TO JOIN THE DISCUSSION
Support Spread
We need the support of our members to keep our forum online. If you find the information on spread useful please consider a donation

Posted by

Bart Kleimeer
Well Engineer
Discussions: 1
Replies: 1
Related Discussions
Unsecured wearbushing in ESP tubing head (surface wellhead)
Downhole chemical injection sub providers
ESP pump usage
HWO of ESP completions
Cross-Coupling ESP Clamps - Non-metalic or coated.