Well Test

20 January 2014 I'm looking for a relative cost comparison of a gas well that is designed for a cased hole well test vs one that is designed for testing after running a completion. Land well, 10k wellhead, Casing program 13⅜" surface @ 1,000m, 9⅝" intermediate @ 2,500m and 7" liner @ 4,000m across reservoir. Single zone test. Assumption made is that in either case the well would be abandoned.

A time comparison (instead of cost) would be a better way of going about it.

Thanks

Rajiv