Well Test
20 January 2014 I'm looking for a relative cost comparison of a gas well that is designed for a cased hole well test vs one that is designed for testing after running a completion. Land well, 10k wellhead, Casing program 13â…œ" surface @ 1,000m, 9â…" intermediate @ 2,500m and 7" liner @ 4,000m across reservoir. Single zone test. Assumption made is that in either case the well would be abandoned.A time comparison (instead of cost) would be a better way of going about it.
Thanks
Rajiv
2 Answer(s)