Testing DST string mid-way in the hole
13 March 2014 Hi folksAt a recent TWOP here in Kurdistan, we discussed the current plan to pressure-test the DST tubing (3"" PH-6) when it's half-way in the hole. The string will have already been tested once the 'BHA' has been made up, so this is an additional test.
When challenged, our Testing Co advised that many companies test every 500m or 1000m run.
The string will be run in a vertical hole in solids-free fluid.
We'd value your opinions and experience on whether it's worth spending the time on a mid-way test. In particular:
- What do you and your company do ?
- Have you had failures when testing PH-6 ? If so, how often/many
- What precautions do you take to avoid a failed test ?
Dave
8 Answer(s)
PLEASE LOGIN OR SIGN UP TO JOIN THE DISCUSSION
Support Spread
We need the support of our members to keep our forum online. If you find the information on spread useful please consider a donation
Posted by
Related Discussions
4-3/4" VAM EIS DC
Use of Drill Collar for DST
Brine preparation for DST in deepwater exploration wells
Under-balanced DST