Use of ROD (Ream on Demand) to drill-out 20" casing shoetrack
25 September 2014 Hi folksAt the Deepwater DWOP this week, we discussed the fact that we are going to be drilling a 12¼" pilot-hole below the 20" shoe in the upcoming Exploration wells.
The current plan is to make a dedicated run to drill out the cement before tripping to run the 12¼" BHA.
It was suggested that we incorporate an On-Demand Reamer (that can be opened and closed as often as required), open it to drill out the cement and then close it for the pilot-hole.
However, this particular reamer will only open to 15". So the idea was rejected for fear of "cement blocks".
What experience do members have of this situation? Have you tried it and, if so, what did you learn? What other suggestions do you have?
Many thanks
Dave
11 Answer(s)
PLEASE LOGIN OR SIGN UP TO JOIN THE DISCUSSION
Support Spread
We need the support of our members to keep our forum online. If you find the information on spread useful please consider a donation
Posted by
Related Discussions
Moving rigs at deep raft
Securing Drillstring
Pre-making BHA's Onshore
Removing Trapped Air From Subsea Wells
Overside Working Requirements