Marine Riser Analysis for DST's Operations
19 February 2015I have been told that BP is running in addition to the Marine-Riser-Analysis (MRA) study (done before starting any drilling operations) a MRA also before running a DST. Honestly I can not understand the added value on doing that. Can anyone within the community advice if this is a common practice within the industry? A part of BP I have not heard anyone else doing it.
Many thanks in advance for any comment/advice
2 Answer(s)
PLEASE LOGIN OR SIGN UP TO JOIN THE DISCUSSION
Support Spread
We need the support of our members to keep our forum online. If you find the information on spread useful please consider a donation

Posted by

Fabrizio Della Lucia
Drilling Manager
Discussions: 1
Replies: 3
Related Discussions
Mud mats in deepwater.
Recent trends in "Jetting, driving, drilling in conductors in deepwater?".
Soil shear strength, fracture gradient in shallow deepwater sediments?
Mud volcano's
Deepwater Ooze?

