Rig Personnel Requirements
20 December 2008 Currently looking into rig selection for upcoming HTHP work(offshore
Indonesia) and am looking for some information on Drilling
contractor
personnel and crew training requirements for HTHP work. Does anybody
have any information or links that will help me develop some minimum
specifications for the drilling contractor.
Dan Geary
Anadarko, Indonesia
8 Answer(s)
PLEASE LOGIN OR SIGN UP TO JOIN THE DISCUSSION
Support Spread
We need the support of our members to keep our forum online. If you find the information on spread useful please consider a donation

Posted by

Dan Geary
Project Drilling Mgr.
Anadarko Petroleum Corporation
Discussions: 1
Replies: 0
Related Discussions
Ultra HTHP drilling solution
Minimum Rig Standards for drilling HPHT wells
Shutting in the well on a jack-up : Annular or Pipe Rams
Pipe-conveyed logging vs. conventional
HPHT Mud Line Tie-Back

