NO BUMP WIPER PLUG
20 September 2018 Hello I recentlly went to a 13 3/8" cementing job and I had this problem. When I reach the final pressure, 1500 Psi, we stoped the pumping but the pressur drop to 400 Psi. The floting equipment was test and, was ok. So what could happend there?Best regards,
Documents uploaded by user:
1 Answer(s)
PLEASE LOGIN OR SIGN UP TO JOIN THE DISCUSSION
Support Spread
We need the support of our members to keep our forum online. If you find the information on spread useful please consider a donation

Posted by

Aquiles Carrera
Cementing engineer
Discussions: 1
Replies: 0
Related Discussions
Light Weight Cement for Structural Casing
Cementing 30" With No Vent Valve
Cementing through Tesco Casing Running Tool
Cement mule shoe
Displacing liner cement with water to suspend