Pros / Cons of using a mudline suspension system when drilling from a Jack-up over a platform
24 June 2019 Planning to drill a shallow (1,200m) well in 70m water depth, using Jack-up, over a small platform. Anyone looked at the pros / cons of using a mudline suspension system to support the casing loads at the seabed, rather than at the wellhead. Also, what are the thoughts on cementing all the annuli back to surface or leaving the annuli with mud - ie using the wash ports to clean out the annuli above the mudline.3 Answer(s)
PLEASE LOGIN OR SIGN UP TO JOIN THE DISCUSSION
Support Spread
We need the support of our members to keep our forum online. If you find the information on spread useful please consider a donation