Running Completion through Plastic Gilsonite Zones
04 August 2019 Hi All,First time poster
Wondering if anyone has experience with sneaking completions past layers of plastic Gilsonite.
Recently we had difficulty running a 4-1/2" lower completion (max OD 5.5") in 6" hole.
Prior to running the completion a clean out trip was run, all sticky zones were reamed until pipe passed freely. This was in a fractured limestone reservoir - The hole was full of produced crude. Static BHT 81° C. We attempted to wash away the Gilsonite with crude, and resorted to high slack off weight (and overpulls) to pass the zone.
It was suggested to me that pumping "cold" (40° C) crude from our tank farm would cause the gilsonite to harden.
It was also suggested that a diesel pill would dissolve the gilsonite easily, however we were not rigged up for that at the time.
Just looking to hear generally anyones experience with plastic gilsonite and things you have tried which worked (or didnt work)
Thank you
1 Answer(s)
PLEASE LOGIN OR SIGN UP TO JOIN THE DISCUSSION
Support Spread
We need the support of our members to keep our forum online. If you find the information on spread useful please consider a donation
Posted by
Related Discussions
Welltesting .. in daylight hours only ?
ESP's v Gas Lift
Experience with control-line clamps
Injection valves
Annular Safety Valves