IOGP Recent well control accident/incident report
03 September 2019
|
|
|
|
0 Answer(s)
PLEASE LOGIN OR SIGN UP TO JOIN THE DISCUSSION
Support Spread
We need the support of our members to keep our forum online. If you find the information on spread useful please consider a donation

Posted by

Peter Aird
Drilling Specialist/Well Engineer/Training Consultant
Discussions: 114
Replies: 449
Related Discussions
Dynamic transmission fluid effects?
BOP pressure test times
Offline testing of safety valves
Casing rams
Well control after drilling with casing

