liner cementation
18 October 2019 Has anybody had any good/bad experience of achieving a good cement bond/zonal isolation when cementing a 4.1/2" liner in an 8.1/2" hole?The hole would be vertical through sands and shales at 3500m with a 300m liner including 100m liner lap, LTOBM at 1.4 sg and 140 deg C. Not too demanding and no restriction on pump rate or rotation if required.
2 Answer(s)
PLEASE LOGIN OR SIGN UP TO JOIN THE DISCUSSION
Support Spread
We need the support of our members to keep our forum online. If you find the information on spread useful please consider a donation