Ongoing Well Control Incident : 19May09

19 May 2009 Dear Fellow Members,

Please can someone help.

At the moment we are having a well control situation on our Land rig.

Well Info:
Operations: Workover
13-3/8” Csg Shoe @ 1672 ft
9-5/8” Csg Shoe @ 4617 ft
7” Lnr @ 7013 ft
4-1/2” Lnr @ 7740 ft

Description of Event:
- We had the kick when POOH with 3-1/2” Tbg, then shear the 3-1/2” Tbg.
- Run Schlumberger down-hole camera - observed Leaks @ 222 ft, 300 ft and 340 ft.
- At the moment, we are having the flow outside the Cellar meaning there could be an underground blowout.
Current Operation:
- Attempted to POOH with 3-1/2” Tbg whilst working with BA Set (Presence of H2S) - No success
- Attempted to set DLT Parker - No success
- Decided to pump cement and abandon well - pumped 600 bbls of 15.8 ppg neat cement - Observed Casing pressure to be 100 psi
Your recommendation please?
- Where do we go from here - the flow has channeled outside the well - meaning we cant pump more cement as this would displace the hole volume to surface.

Please I need your recommendation.

Thankyou

_____________________________________________________

Notes from Admin :

Given the severity of the situation in which our colleague finds himself, normal guidelines no longer apply (regards going thru the forum), so you can contact him directly on :

odion.ikhajiagbe@gdi.com.qa .. copied to : odikhas@yahoo.com

Please copy me on any correspondence and I will update the site accordingly .. but the priority is to HELP this team.



10 Answer(s)

Support Spread

We need the support of our members to keep our forum online. If you find the information on spread useful please consider a donation

donate