Tieback for 30” conductors that have been cut at the seabed
10 February 2023We want to tieback 2 shallow water wells in westcoast of India for development which have the 30” cut instead of backing off from the seabed using quick lock connectors due to unavailibility.
Has such project been undertaken anywhere in the world. Can somebody throw some light on this.
Thanks
9 Answer(s)
PLEASE LOGIN OR SIGN UP TO JOIN THE DISCUSSION
Support Spread
We need the support of our members to keep our forum online. If you find the information on spread useful please consider a donation
Posted by
Related Discussions
Welltesting .. in daylight hours only ?
ESP's v Gas Lift
Experience with control-line clamps
Injection valves
Annular Safety Valves