Risk assessment samples for (5.1.3.3 and 5.1.4) sections from API STD 53.
17 December 2023Does anyone have a risk assessment sample on 5.1.3.3 and 5.1.4 sections from API STD 53?
5.1.3.3: Surface BOP stacks and 5.1.4: BSR risk assessment.
1 Answer(s)
PLEASE LOGIN OR SIGN UP TO JOIN THE DISCUSSION
Support Spread
We need the support of our members to keep our forum online. If you find the information on spread useful please consider a donation

Posted by

Maher Sahmi
Night Drilling Supervisor
Discussions: 2
Replies: 3
Related Discussions
Dynamic transmission fluid effects?
BOP pressure test times
Offline testing of safety valves
Casing rams
Well control after drilling with casing

