DISCUSSIONS

Unanswered
SUBJECT POSTED BY GROUP LAST ACTIVE REPLIES
Use of OBM for drilling of 8.5" laterals, approx. 10000 ft length from Offshore Jackup rigs_Risk involved Bhushan Salve Drilling Operations 11 May 2021 2
Cemen not bonded properly Ar Vi Remedial Cementing 11 May 2021 0
13-3/8" Double valve Autofill type TOPCO float shoe Float Collar Bhushan Salve Drilling Equipment 11 May 2021 10
BOP jet sub with integral swab cups (to stop debris falling down the well) Dave Taylor - SPREAD Moderator Milling 11 May 2021 12
Pressure pumper Engine Gaz Rahchamani General discussions 11 May 2021 1
StressCheck - Catalog Issue Sean Gibson Drilling Software 11 May 2021 5
well control Boulacel Farid General discussions 11 May 2021 7
Brown field low cost well design options Chris Sugden Performance 11 May 2021 10
Drilling ahead through an uncemented shoe Ken Horne. Drilling & Completion 11 May 2021 10
Wells Register Ian McIlwaine HSE 11 May 2021 3
Optimum WEG depth above top perforation Elsayed Nasr Completion 11 May 2021 1
Deepwater pore & fracture presure and temperature regimes ; Best practise. Peter Aird Deepwater specific 11 May 2021 0
Premium Connection Interchangeability Umair Ahmed Baig General discussions 11 May 2021 2
Equalising v Non-Equalising Tubing Retrievable Safety Valves on Subsea Oil Projects Brijesh Dutta Completion 11 May 2021 0
Tantalisingly close to 2000 members Dave Taylor - SPREAD Moderator RP-squared announcements 11 May 2021 0
Rig Positioning Himanshu Patel Deepwater specific 11 May 2021 1
Well Control Certification Himanshu Patel Well Control 11 May 2021 1
Conductor wobble in soft soils - CAN solutions? Peter Aird Deepwater specific 11 May 2021 3
FUTURE OF RIGS Malcolm Sharples General discussions 11 May 2021 4
Kick Tolerance method and requirements Andrea Atanes Well Control 11 May 2021 0