DISCUSSIONS

Unanswered
SUBJECT POSTED BY GROUP LAST ACTIVE REPLIES
Guides for a Well Control procedure for shale gas / coal bed methane drilling. Cst Flr Drilling Operations 11 May 2021 2
Gas Detectors James Drouin Drilling Operations 11 May 2021 3
Welding 30" conductor casing Chajar Sugiarto Drilling Operations 11 May 2021 10
P&A off wells with obstructions due to subsidence Svein H Solversen Abandonments (facilities and/or wells) 11 May 2021 5
8RD vs Buttress Navin Singh Casing & Liners 11 May 2021 1
Minimal rig specification for a HPHT/ H2S wildcat well Cst Flr HTHP 11 May 2021 3
TOC / APB Issues Gary Buyers Abandonments (facilities and/or wells) 11 May 2021 7
Only another 56 to go .. to the magic 1500. INVITE a FRIEND ! Dave Taylor - SPREAD Moderator SPREAD Updates (Hints and tips) 11 May 2021 0
SET(Solid Expandable Tubular) in Ultra HPHT sections? Noor Nordin Expandables 27 July 2021 1
Interpreting Leak off Tests (LOT) Dave Taylor - SPREAD Moderator Well Control 11 May 2021 3
Well Control a variable water injector reservoir pressure John Correa Casas Well Control 11 May 2021 3
Drilling w/ Landing String Matt Madson Deepwater specific 11 May 2021 4
Displacement fluid Chris Hindmarsh Cementing 11 May 2021 3
Mud mixing procedures on the rig. Chris Henderson Drilling Fluids 11 May 2021 4
Temperature Effects On CaBr Brines Jim Daniels Completion 11 May 2021 7
Severe Vibration Drilling Top Hole Lyle Hopkins Drilling Operations 11 May 2021 21
Cementing 5" liner in 6" hole Valentin Tyulyakov Cementing 11 May 2021 4
Close tolerance between casing/tubing dave buckley Completion 11 May 2021 6
Expectations Workshops (PNG) Dave Taylor - SPREAD Moderator BLOG : Relentless Pursuit of Perfection 11 May 2021 0
Conn torque and dope preference in H2S wells. Chris Henderson Drill String Design 11 May 2021 9