Use of HW in drilling laterals
09 August 2017Wanted to get your views on the use of HWs while drilling 8-3/4" lateral. We have a 2°, 12-1/4" tangent section. 9-5/8" at ~12,000. Maintain 2° till KOP @ 14,000'. Curve @ 12-14° / 100' to landing point. Laterals are about 10,000' (14,600' TVD). 1.5° motor used to drill lateral. Current BHA consist of motor, NBS, MWD, 5" DP for spacing, 5" HW, 5" DP to surf. Current BHA has 1200' of 5" HWs spaced to be at KOP when at TD. Want to explore laying out the HWs.
Ran some multi-station T&D analysis with as drilled svys till 21,000 (& plan thereafter) and attached the results. It almost looks like past the first 4000' of lateral, the HW does not really help. It does however, seem to push the point where the DP buckles further up the string compared to running without HWs. Eager to hear ya'll thoughts and experience on this subject. Thanks
Documents uploaded by user:
Buckling Weights with and without HW.pdf
6 Answer(s)
PLEASE LOGIN OR SIGN UP TO JOIN THE DISCUSSION
Support Spread
We need the support of our members to keep our forum online. If you find the information on spread useful please consider a donation
Posted by
Related Discussions
Avoiding Stick Slip
Jars
Jars Jars Jars
BHA Inspection Criteria
XT 57, Tight Drillpipe Connections