Mobilization time of a trailer-mounted rig such as MR8000 (DrillMec)

26 August 2020 Hi everyone,

I'm trying to estimate mob/demob for a trailer-mounted rig.
Has anyone had experience with this type of rig? Would be great if it's specifically with MR8000 or equivalent.
This would be for a P&A operation, so basically just cutting/pulling casing, circulation, cementing etc. 200 ton hookload capacity is the key requirement due to the weight of the casing string, which is why I mentioned the MR8000 from DrillMec.

Thank you very much for your time and help!

Larry