ALL DISCUSSIONS IN STUCK-PIPE
Facilitate discussion on stuck-pipe prevention, actions to take in the event of stuck-pipe (that lead to successful freeing) and actions to take in the event that initial pipe-freeing response is unsuccessful.
SUBJECT | POSTED BY | GROUP | LAST ACTIVE | REPLIES |
---|---|---|---|---|
Stuck pipe database | Milind Gokhale | Stuck-pipe | 11 May 2021 | 1 |
Blind Back-off Procedure | Harald Benning | Stuck-pipe | 11 May 2021 | 7 |
'Differential sticking' WITS case studies data for RTAS replay? | Peter Aird | Stuck-pipe | 11 May 2021 | 2 |
Stuck pipe prevention - case studies | Peter Aird | Stuck-pipe | 11 May 2021 | 0 |
Stuck pipe prevention high angle/extended reach wells | Peter Aird | Stuck-pipe | 11 May 2021 | 0 |
Allowable Acid percentage to pump inside Drill String | Mohsen Yavari | Stuck-pipe | 11 May 2021 | 1 |
Stuck CT after screening out frac proppants in entire well | Stian Ronnevik | Stuck-pipe | 11 May 2021 | 1 |
Stabilising formation with silicate mud | Steve Devereux | Stuck-pipe | 11 May 2021 | 2 |
Severing Drill Pipe - pipe not in tension | Stewart McGregor | Stuck-pipe | 11 May 2021 | 14 |
Apply torque in string when jarring down ? | Soren Hartmann | Stuck-pipe | 11 May 2021 | 5 |
Stuck Casing on Floater | Ivan Sogard | Stuck-pipe | 11 May 2021 | 14 |