Inter Field Cuttings Transportation
16 January 2006 We are currently looking into the possibility of transporting drilledcuttings from one field facility to another, for cuttings re-
injection there. Does anyone have experience with such an operation?
Any best practices or information would be gratefully received.
Thanks
Garbhan
3 Answer(s)
PLEASE LOGIN OR SIGN UP TO JOIN THE DISCUSSION
Support Spread
We need the support of our members to keep our forum online. If you find the information on spread useful please consider a donation

Posted by

Garbhan Gibbons
Drilling Enginneer
Discussions: 1
Replies: 0
Related Discussions
running conductor casing
"Green" Casing dope
Cuttings re-injection into gas lifted wells.
Jack up 'Slim hole' finder well design
Well Clean up prior to completion

