running conductor casing
23 August 2005 30 inch Conductor Casing has slope indicator brackets 2m aboveseabed.For installation of funnel shaped production guidebase before
rig release the brackets have to grinded using ROV because they
interfere with the guidebase.Before this intervention can be done
and started the surrounding area has to jetted by running in jet sub
on drillpipe.This consumes lot of rig time and can be more in deep
water.
Can my colleagues in Aberdeen or elsewhere give us some lead or
example running conductor casing without slope indicator brackets
and save rig time and ROV intervention
Best Regards Anil Nagrath Perf Consultant Egypt Offshore