ROV Pinch Ring's Option to Re-Establish the Guideline to Guide Posts
27 August 2009 For our well Re-entry and P&A programme to exisiting wellhead on October 09, we are considering to use Pinch Rings (from ToTal Marine Technology ROV company) to connect the Subsea rig's Guidelines onto the Guide Posts. This is one of options such as standard Regan GL-4 Rereasing Tool (Go Devil), Imenco Anchor Latch into Guidepost tops etc. I am wondering if you have experiences with the Pinch Ring Usage personnelly? Appreciate if you could forward to me your references or contact point for Pinch Ring usage in the past or currently planning. Thank you in advance.Hung, Tran Nam - BP Senior Drilling and Operations Engineer, Viet Nam
0 Answer(s)
PLEASE LOGIN OR SIGN UP TO JOIN THE DISCUSSION
Support Spread
We need the support of our members to keep our forum online. If you find the information on spread useful please consider a donation
Posted by
Related Discussions
Cutting Tubing in Compression
Well Kill
Slot Recovery
Workover of subhydrostatic wells in offshore oil field
13 Cr Tubing Punch