DISCUSSIONS

Unanswered
SUBJECT POSTED BY GROUP LAST ACTIVE REPLIES
Ram preventers Chris Hindmarsh Well Control 19 December 2021 6
Dopeless connection Koji Matsui Casing & Liners 11 May 2021 3
Hydril PH-6 versus VAM TOP as a FRAC String Derek Munro Fracc'ing Ops 11 May 2021 1
Drop in Gyro and PBL sub in a BHA Nishad Patil Drilling Operations 11 May 2021 1
liner cementation Ed Appleton Cementing 11 May 2021 2
drawback of using L80 and VM95 in the same completion Daddy KOUDIATOU SMART Completions 11 May 2021 2
Cementing in Oil-based Mud Denys Holub General discussions 11 May 2021 8
« Craig list » for old equipment Mase Yan Drilling Equipment 11 May 2021 1
Perforation without surface Indication and Losses Johnson Adekoya Well Services 11 May 2021 6
Re-entry Exploration well without Mud Line Hanger Juliana Mentari Drilling Equipment 11 May 2021 3
Best parameters to drilling out cement plugs Mohammad Alyazgi Drilling with casing 11 May 2021 6
SPREAD-Bot Dave Taylor - SPREAD Moderator SPREAD Updates (Hints and tips) 11 May 2021 0
Stuck pipe prevention high angle/extended reach wells Peter Aird Stuck-pipe 11 May 2021 0
re-entering abandoned wells Pete Thomson Abandonments (facilities and/or wells) 11 May 2021 7
Emissions Tom Macrae General discussions 11 May 2021 1
Rigless P&A - wells with CIM/DPG Dirk Heseman Abandonments (facilities and/or wells) 11 May 2021 2
How to get weight to the bit in a long, horizontal lateral well? Douglas Buckland Drilling Operations 28 April 2022 3
Engineering calculations for anchors William Burch Well Control 11 May 2021 0
Drill Pipe backout from TD saver sub and twisted at the connection between HWDP FH and the rest of the BHA at about 5600 ft below Kingsley Okenyi Drilling with casing 11 May 2021 17
Drill Collar Shoulder Problem Adem Buyukdacik Hole Problems 11 May 2021 9