DISCUSSIONS

Unanswered
SUBJECT POSTED BY GROUP LAST ACTIVE REPLIES
Pre drilled liner Stefan 't Hart Casing & Liners 11 May 2021 3
Hole Openers floats Edward Hewitt Drill String Design 11 May 2021 5
Bowen collar? Andrew Kay Casing & Liners 11 May 2021 2
Ported vs. non-ported floats .. and dart subs Dave Taylor - SPREAD Moderator Drill String Design 11 May 2021 18
Shallow testing MWD/FEWD strings Dave Taylor - SPREAD Moderator Drilling Operations 11 May 2021 13
Deepwater - Methanol Gregor Crum Drilling Operations 11 May 2021 4
Abandonment of MLS Well with Possible live 9 5/8/7" Annulus david deveney Drilling Operations 11 May 2021 9
BOP test frequency : changes post Macondo Dave Taylor - SPREAD Moderator Well Control 11 May 2021 18
Starting to pull secondary anchors as soon as BOP unlatched Dave Taylor - SPREAD Moderator DWOP Comments 11 May 2021 7
Usage of swell packers NEHAL SIDDIQUI Completion 11 May 2021 4
Unsecured wearbushing in ESP tubing head (surface wellhead) Dave Taylor - SPREAD Moderator ESPs 11 May 2021 2
Welcome to new SPREAD! Dave Taylor - SPREAD Moderator SPREAD Updates (Hints and tips) 27 July 2021 0
Pipe-conveyed logging vs. conventional Dave Taylor - SPREAD Moderator HTHP 11 May 2021 6
Running 13-3/8" through 16" liner Peter Aird Casing & Liners 11 May 2021 4
Taking SCRs Dave Taylor - SPREAD Moderator Well Control 11 May 2021 2
Testing Storm Chokes Douglas Noble Completion 11 May 2021 2
Cement setting problem across shale section Sean Gibson Cementing 11 May 2021 3
Shutting in the well on a jack-up : Annular or Pipe Rams Dave Taylor - SPREAD Moderator HTHP 11 May 2021 9
PBL sub reliability Peter-Joern Palten Drill String Design 27 July 2021 13
Relentless Pursuit : awarded coaching contract in Indonesia; HTHP work; HSE Dave Taylor - SPREAD Moderator Performance 11 May 2021 0