DISCUSSIONS

Unanswered
SUBJECT POSTED BY GROUP LAST ACTIVE REPLIES
Wireline Sheave Hangoff Sub Allan Herd Well Services 11 May 2021 3
ECP/DV Tool to prevent gas migration the 9-5/8" x 13-3/8 annulus? Alaric Phillips Casing & Liners 11 May 2021 1
Drill string corrosion James Carr Drilling Equipment 11 May 2021 3
ROV Pinch Ring's Option to Re-Establish the Guideline to Guide Posts Hung Tran Nam Workover 11 May 2021 0
Suspending Drilled Wells Mid-way Doug Hodson Drilling & Completion 11 May 2021 8
Dope-less Connections Al Norcroft New Technologies 11 May 2021 2
Use Simulated Annealing method to Compute Optimal Casing Setting Depth Gray Tan Casing & Liners 11 May 2021 0
RAM Block Corrosion Huib Attema Well Control 11 May 2021 1
How to analyse the drillability and steerability of an extended reach well Divine Somiari Drilling Operations 11 May 2021 0
Milling Cemented 7" Liner Hanger System Calum MacDonald Drilling Operations 11 May 2021 6
Determination of the uncertainities involved in hitting subsurface target Divine Somiari Drilling Operations 11 May 2021 6
Drilling 8 1/2" hole vs 6" hole Edwin Damasena Drilling Operations 11 May 2021 6
Drilling in Carbonate formation Minh Tri Le Tran Casing & Liners 11 May 2021 1
Guidelines on asking questions Dave Taylor - SPREAD Moderator SPREAD Updates (Hints and tips) 11 May 2021 0
Casing string damage Ron Mackay Casing & Liners 11 May 2021 1
Dealing with "Gumbo attacks" Chris Henderson Drilling Operations 11 May 2021 8
Electronic/Magnetic Tagging of Tubulars Doug Hodson Casing & Liners 11 May 2021 4
Automated rigs - pros and cons Steve Devereux Performance 11 May 2021 1
Well Control Odion Ikhajiagbe Well Control 11 May 2021 5
Electronic drifting of Tubulars Doug Hodson Casing & Liners 11 May 2021 2