Open hole Squeeze packer Procedure
13 May 2022We are planning to RIH w/ Open hole squeeze packer 15" size in 16" hole which is generallly 17" size.
Purpose is to set it at approx. 3000 ft depth at 40 deg Inclination and perform cement squeeze job to cure losses in radhuma (vugular losses).
I was writing a procedure, if anyone has already would be great .
13 Answer(s)
PLEASE LOGIN OR SIGN UP TO JOIN THE DISCUSSION
Support Spread
We need the support of our members to keep our forum online. If you find the information on spread useful please consider a donation

Posted by

Bhushan Salve
Island ERD Drilling Engineer
Discussions: 5
Replies: 6
Related Discussions
running conductor casing
"Green" Casing dope
Cuttings re-injection into gas lifted wells.
Inter Field Cuttings Transportation
Jack up 'Slim hole' finder well design

