Dual Completion Running
20 February 2010 Does anyone know of a safe method of temporarily separating dual tubing strings to allow engaging the tubing tong while running completion? Our tubular running service provider supplies a 2-handled lever device that requires 2 men to operate safely, but there is a lot of stored energy and potential for injury if inadvertently released.Regards,
David MacDonald
Vico
Jakarta, Indonesia
4 Answer(s)
PLEASE LOGIN OR SIGN UP TO JOIN THE DISCUSSION
Support Spread
We need the support of our members to keep our forum online. If you find the information on spread useful please consider a donation
Posted by
Related Discussions
Welltesting .. in daylight hours only ?
ESP's v Gas Lift
Experience with control-line clamps
Injection valves
Annular Safety Valves