DISCUSSIONS

Unanswered
SUBJECT POSTED BY GROUP LAST ACTIVE REPLIES
CoC Nasser AL JABIR General discussions 03 July 2024 3
Reciprocation and rotation using the Annular BOP Sidi Yahia Berrouigat Well Control 01 July 2024 5
Loss zone below kick zone Dave Taylor - SPREAD Moderator Well Control 30 June 2024 4
Filming Location Brandon Doo Abandonments (facilities and/or wells) 23 June 2024 0
Drilling surface cement plugs with hydrocarbons trapped below while the annular is at full working pressure due too little to no reaction time. Dale Hutchinson Drilling Operations 26 June 2024 4
Removing a kick off cement plug to gain access to the well below the plug Steve Nas Well Integrity 16 June 2024 13
Offline make up and rack back 9-5/8", Run in stand with CRT Shufazia Noorain Casing & Liners 09 June 2024 0
Relationship between ECD and BHP in ERD Wells Sidi Yahia Berrouigat Drilling Operations 30 May 2024 8
Forces calculation while cement 4" 1/2 liner Feras Nid Casing & Liners 19 May 2024 3
Join Our Live Online Course: Sand Exclusion – Alternative Solutions Indah Anggraeni Training and Competency 05 May 2024 0
Swellable packer as a well barrier Steve Nas Geo-thermal well specific 20 May 2024 11
Hybrid-TWOP summary: Soon Digital DWOP Dave Taylor - SPREAD Moderator BLOG : Relentless Pursuit of Perfection 14 April 2024 1
Water wells via air drilling Ibrahim Abraham Drilling Operations 07 April 2024 2
What is DWOP MATHEW KAMAU Drilling & Completion 07 April 2024 1
Calculating Cuttings Volumes/Weights David Castillo Well Integrity 31 March 2024 0
Wireline OH Nasser AL JABIR Data Acquisition 01 April 2024 6
13 3/8'' casing in 16 in hole Carlos Nunez Drilling Operations 29 April 2024 20
Casing Seat Selection Evgenii Sorokin Casing & Liners 07 June 2024 15
Fly or Jet pump design, for use in well cellars Jorrit Schreuder Drilling Operations 18 March 2024 6
Plugged Chemical Injection Line Peter Forsyth Completion 05 March 2024 6