Schluberger MPM
23 April 2011 We are going to use Schlumberger multi phase meter to test two gas wells in same time one is producing and other is injectionWe will connect the both to each other and install the MPM.
Any one have experience with Schlumberger MPM and what is the Risk of using MPM in gas platform.
0 Answer(s)
PLEASE LOGIN OR SIGN UP TO JOIN THE DISCUSSION
Support Spread
We need the support of our members to keep our forum online. If you find the information on spread useful please consider a donation
Posted by
Related Discussions
Welltesting .. in daylight hours only ?
ESP's v Gas Lift
Experience with control-line clamps
Injection valves
Annular Safety Valves