Completions : Basis for Final Annulus Test
30 June 2007I´m doing some TL support at the moment and the following question
came up at the Completion Programme Review :
The final annulus pressure test - land wells
The packer has been set and tested from below. The tubing hanger
has been set and seals tested thru the test port 10,000 psi. Tubing
has been tested to 6500 psi.
The final annulus pressure test is programme at 3500 psi ?
Questions :
a. What is the basis for the final annulus pressure test ? Is
it a test of the packer from above or a system integrity test ?
b. If it´s a final system integrity test, should it be to
maximum expected CITHP (in our case 5000 psi)
Your comments would be greatly appreciated
Thanks
Dave Taylor
1 Answer(s)
PLEASE LOGIN OR SIGN UP TO JOIN THE DISCUSSION
Support Spread
We need the support of our members to keep our forum online. If you find the information on spread useful please consider a donation
Posted by
Related Discussions
Welltesting .. in daylight hours only ?
ESP's v Gas Lift
Experience with control-line clamps
Injection valves
Annular Safety Valves