Completion for gas-conedsate reservoir with initial pressure below hydrostatic
18 June 2013Dear Community please advice:
We have tiny gas-condensate reservoir with initial pressure below hydrostatic 330 bar @ middle of perforated interval 4047-4042 m (pressure gradient 8.1 KPa/m)
Production casing is 5¾" with wall thickness 10.7 mm (non API casing)
The reservoir is heavily invaded due to perforating several intervals together; some of them with water where pressure gradient is 10.4 KPa/m.
Could you please give me an advice what will be the best completion taking into account that before the reservoir start working in stable flow will need help with nitrogen or compressor to get all water / filtrate cleaned out.
Thanks in advance
1 Answer(s)
PLEASE LOGIN OR SIGN UP TO JOIN THE DISCUSSION
Support Spread
We need the support of our members to keep our forum online. If you find the information on spread useful please consider a donation
Posted by
Related Discussions
Welltesting .. in daylight hours only ?
ESP's v Gas Lift
Experience with control-line clamps
Injection valves
Annular Safety Valves