Susbsea BOP & christmas tree

Hi Everyone,

Greetings for the day.

I need information on Running Subsea BOP & Christmas tree simultaneously. Following are some of the points, I need clarification on.

1. Casing Profile after running BOP and tree.

2. Can mud settling in x-mass tree can block valves in tree while drilling.

3. What are the equipment's to be considered on the vessel.

4. What are problems face while testing BOP.

5. Minimum BOP stack & ram blocks configuration to be used.

Further if there are any other point to be considered please advice.

Thank You.

0 Answer(s)

Support Spread

We need the support of our members to keep our forum online. If you find the information on spread useful please consider a donation

donate